Stakeholders ask the program manager to assess reasons for the project's delay and provide a report also, the program manager must identify steps to be taken to ensure the program will finish on time and within budget. The program manager distributes information in accordance with which of the following?


A. Stakeholder engagement plan
B. Program governance charter
C. Schedule management plan
D. Communications management plan
User badge image
Estudando com Questões

há 2 anos

Respostas

User badge image

Ed Verified user icon

há 2 anos

A resposta correta é a opção D. Communications management plan. O plano de gerenciamento das comunicações define como as informações serão distribuídas aos stakeholders e como a comunicação será realizada durante o projeto.

Essa resposta te ajudou?

0
Dislike0
left-side-bubbles-backgroundright-side-bubbles-background

Crie sua conta grátis para liberar essa resposta. 🤩

Já tem uma conta?

Ao continuar, você aceita os Termos de Uso e Política de Privacidade

Ainda com dúvidas?

Envie uma pergunta e tenha sua dúvida de estudo respondida!

Mais perguntas desse material

What is the correct sequence of Brazilian literary works from the colonial period?


a. 5, 6, 1
b. 6, 1, 4
c. 5, 6, 1

What's the MINIMUM depth of a trench from top of the cable/conduit to final grade? (Select two options.)

The question is incomplete and cannot be answered.
A. 305 mm(12 in)
B. 610 mm (24 in)
C. 914 mm (36 in)
D. 1270 mm (50 in)
E. Below the area's 50-year frost line

Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?


A. Verify the equipment controls are in the proper operating position.
B. Train workers to perform the LOTO process.
C. Apply appropriate tags both locally and remotely.
D. Confirm the device is de-energized by proving it will not run when started.
E. Confirm all unnecessary items have been removed from the area.

You have just finished a design calling for 15 telecommunications outlets. You received word that the owner has increased his requirements by 40%. What size commercial DD (distribution device) is required to accommodate the increase?


A. 660 mm (26 in)
B. 1015 mm (40 in)
C. 1346 mm (53 in)
D. 1676 mm (66 in)

A program management team is invited to a company's annual strategy planning session. The CEO discusses the mission and vision of the organization, and how the strategic plan will create opportunities to fulfill them. How can the program manager use the company's vision to establish a program?


A. Define the program and component projects to enable the fulfillment of strategic goals
B. Set the priority matrix and map the projects' priorities that will be included in the program
C. Define the program roadmap, and highlight the individual projects' benefits
D. Identify program benefits that will enable the fulfillment of strategic goals

Company A acquires company B, which leads to a two-year program to integrate the processes and systems. Company B uses a different project management process, and the company's staff is unhappy about the acquisition. As a result, company B's project team fails to provide status and cost data in a format that conforms to the program standards. What should the program manager do first?


A. Inform the stakeholders of this issue as soon as possible
B. Change the program standards, aligning them with the project standards
C. Work with the reports provided to extract the required information
D. Remind the project manager of the relevant program standards

An organization initiates an innovation program to deliver exceptional performance and benefits. After the program transition plan is in place and the implementation of a benefits sustainment plan starts, the program manager discovers the program may be shut down due to lack of funding. To ensure continued funding for the program, what should the program manager do next?


A. Complete t
B. Develop a risk management plan
C. Create a benefits realization plan
D. Develop a business case

Which two types of equipment are included in telecommunications infrastructure? (Choose two.)


A. Cross-connect facilities
B. Telecommunications equipment
C. Environmental controls
D. Lighting controls
E. Building system equipment

A pay telephone using coins needs to be installed in a public area. In the specifications, it is required that the telephone shall meet the ADA (American with Disabilities Act) requirement for front reach using a wheelchair. What will be the maximum reachable height or the value of 'X'?


A. 760 mm (30 in)
B. 864 mm (34 in)
C. 1170 mm (46 in)
D. 1220 mm (48 in)
E. 1370 mm (54 in)

The benefits register should include which of the following?


A. List of planned benefits, earned value (EV) and responsible person
B. List of planned benefits, measurement method, and component mapping
C. List of planned benefits, benefit creator and realization date
D. List of planned benefits, stakeholders, and risk level

A commercial office building floor has a usable floor space of 1858 m2 (20,000 ft2). What is the MINIMUM number of 103 mm (4 trade size) conduits that shall be required to interconnect the telecommunications rooms on this floor?


A. 0
B. 1
C. 2
D. 3

The results of identifying and verifying risks as outlined in the risk management plan should be recorded in which of the following?


A. Risk register
B. Risk monitoring and control
C. Risk response planning
D. Risk mitigation strategy

A program manager initiates a new global program to create a higher level of protection for a company's intellectual property. What should the program manager do next?


A. Tailor program sponsor and stakeholder engagement and communications activities to meet the company's expectations.
B. Insist on maintaining a set of tightly controlled stakeholder register and engagement plan documents to meet expectations
C. Provide detailed information to the most influential program sponsors and stakeholders
D. Ensure that the component stakeholders have the appropriate level of communications required to meet their needs

What activity should the program manager perform next if a critical program for a company fails to deliver its intended benefits due to unmet expectations for a component?


A. Program delivery management
B. Resource Interdependency management
C. Program performance monitoring and controlling
D. Benefits sustainment and program transition

What is the MAIN concern with a poke-thru installation?


A. The compatibility with the telecommunications outlet/connector
B. The structural integrity of the floor assembly
C. The fact that it is beneath the floor
D. The diameter of the poke-thru device

At this stage of the program, what is the first step?

The program is already underway
The company has three production plants
The company has five regional sales departments
The first step is to develop a program work breakdown structure
The first step is to identify and quantify business benefits of the program
The first step is to determine and prioritize the various components of the program
The first step is to prepare a program organization chart covering both sales and production
A. Develop a program work breakdown structure
B. Identify and quantify business benefits of the program
C. Determine and prioritize the various components of the program
D. Prepare a program organization chart covering both sales and production

Mais conteúdos dessa disciplina