Logo Passei Direto
Material
Study with thousands of resources!

Text Material Preview

Download IBM C1000-137 Exam Dumps For Best Preparation
1 / 3
Exam : C1000-137
Title :
https://www.passcert.com/C1000-137.html
IBM Spectrum Protect
V8.1.12 Implementation
Download IBM C1000-137 Exam Dumps For Best Preparation
2 / 3
1.What is a requirement for configuring the Object Agent to accept S3 data?
A. A dedicated S3 bucket for IBM Spectrum Protect backups
B. A physical tape library connected to the S3 bucket
C. A static IP address for each object in the S3 bucket
D. S3 buckets located in the same region as the IBM Spectrum Protect server
Answer: A
2.Which of the following is NOT a step in the installation process of the IBM Spectrum Protect Operations
Center?
A. Configuring the web server port
B. Setting up a direct connection to the internet for updates
C. Defining administrative users
D. Choosing a decorative theme for the UI
Answer: D
3.What is the purpose of an offsite copy pool?
A. to save licensing cost by offloading data
B. to have an offline copy in case of a disaster
C. to enable data reuse and devops from secondary data copy
D. to make room for new data on the IBM Spectrum Protect Server
Answer: B
4.When configuring IBM Spectrum Protect for Mail, what is an important consideration?
A. Ensuring all emails are printed before backup
B. Configuring the backup window to minimize impact on email services
C. Backing up emails to floppy disks for maximum security
D. Email backups should only occur once a month
Answer: B
5.Why is it important to manage security notifications in the IBM Spectrum Protect Operations Center?
A. To ensure all social media updates are communicated
B. To keep track of employees' birthdays
C. To monitor for and respond to potential security threats promptly
D. To filter out important emails from spam
Answer: C
6.In the context of IBM Spectrum Protect, what is a typical method for repairing problems in libraries,
volumes, and containers?
A. Replacing physical components that are damaged
B. Painting over physical imperfections
C. Increasing the volume to drown out error messages
D. Sending a strongly worded email to the equipment manufacturer
Answer: A
Download IBM C1000-137 Exam Dumps For Best Preparation
3 / 3
7.When setting up secure communications for IBM Spectrum Protect, what is an important step?
A. Enabling HTTP on all clients
B. Configuring SSL/TLS encryption
C. Disabling all firewalls
D. Using telnet for all communications
Answer: B
8.A storage pool unexpectedly becomes 100% utilized which may indicate a possible ransomware attack.
How can the Operations Center be used to confirm if it is a ransomware attack?
A. In the DB Backup area, hover over the check marks to review information about backup operations.
B. Review the server properties by selecting a server within the Servers Table and click Details to view if
properties were modified.
C. In the Storage & Data Availability area, in the Volumes section, under the capacity bars review the
status that is reported next to Devices.
D. Review the storage-pool capacity that was used over the past two weeks by selecting a row in the
Storage Pools table and click Details
Answer: D
9.In the context of IBM Spectrum Protect, which protocol is recommended for secure communications
between clients and the server?
A. FTP
B. SSL/TLS
C. SMTP
D. SSH
Answer: B
10.Which information is required when planning for IBM Spectrum Protect server backup policies?
A. migration thresholds
B. replication thresholds
C. retention requirements
D. client backup tiering
Answer: C
11.Configuring IBM Spectrum Protect to enable file restores from one workstation to another involves
what?
A. Disabling all security features
B. Setting up specific client and server options to permit this activity
C. Requiring manual transfer of files between workstations
D. Using external storage devices for file transfers
Answer: B