Text Material Preview
<p>KX3-003 Certified RapidResponse Author Level 3 Exam exam dumps questions</p><p>are the best material for you to test all the related Kinaxis exam topics. By using</p><p>the KX3-003 exam dumps questions and practicing your skills, you can increase</p><p>your confidence and chances of passing the KX3-003 exam.</p><p>Features of Dumpsinfo’s products</p><p>Instant Download</p><p>Free Update in 3 Months</p><p>Money back guarantee</p><p>PDF and Software</p><p>24/7 Customer Support</p><p>Besides, Dumpsinfo also provides unlimited access. You can get all</p><p>Dumpsinfo files at lowest price.</p><p>Certified RapidResponse Author Level 3 Exam KX3-003 exam free dumps</p><p>questions are available below for you to study.</p><p>Full version: KX3-003 Exam Dumps Questions</p><p>1.You want to create a workbook command that deletes records in theHistoricalDemandActual table</p><p>that are more than a year old. You want to perform this action automatically once a week, without</p><p>having to manually run the command.</p><p>In this situation, which two statements are true? (Choose two.)</p><p>A. The worksheet with the automation settings to run the command must be based on the</p><p>HistoricalDemandActual table.</p><p>B. The worksheet with the automation settings to run the command must not have any worksheet</p><p>filtering set.</p><p>C. The command must be run as part of an Automation Chain.</p><p>D. You must create a Scheduled Task to run this command once a week.</p><p>Answer: C D</p><p>Explanation:</p><p>For the automated deletion of records older than a year in the HistoricalDemandActual table, the</p><p>1 / 8</p><p>https://www.dumpsinfo.com/unlimited-access/</p><p>https://www.dumpsinfo.com/exam/kx3-003</p><p>correct approach involves:</p><p>Statement C: Utilizing an Automation Chain. Automation Chains in RapidResponse allow the creation</p><p>of sequences of actions, including data deletions, that can be scheduled or triggered based on</p><p>specific events. This method is essential for implementing complex automations such as deleting</p><p>records based on a date condition.</p><p>Statement D: Creating a Scheduled Task. Scheduled Tasks are crucial for setting up the automation</p><p>to run on a regular interval, such as weekly, withoutmanual intervention. This ensures that the</p><p>command to delete old records is executed consistently every week.</p><p>2.You have a hierarchy called PartFamily that is based on the PartCustomer table. There is a second</p><p>hierarchy in use, also based on the PartCustomer table called PartPlanner. When the PartFamily</p><p>hierarchy is used, performance is noticeably worse than when the PartPlanner hierarchy is used.</p><p>In this situation, which design issue would contribute most to poor performance?</p><p>A. A level in the PartFamily hierarchy uses the Part.Solutions::PartClass.Value expression.</p><p>B. A level in the PartFamily hierarchy uses the Part.ProductFamily.Value expression.</p><p>C. A level in the PartFamily hierarchy uses the expression Part.AGCP::NameAndDescription.</p><p>NameAndDescription is a calculated field in the AGCP namespace. The calculation is Name + " (" +</p><p>Description + ")".</p><p>D. A level in the PartFamily hierarchy uses the Part.Name + " (" + Part.Description +")" expression.</p><p>Answer: C</p><p>Explanation:</p><p>Performance issues often stem from the complexity of calculations and the size of the data sets they</p><p>are applied to. In this case, the use of a calculated field (NameAndDescription) in the hierarchy</p><p>definition is the most likely cause of performance degradation. This field is calculated on the fly using</p><p>a concatenation of the Name and Description, which is a more resource-intensive process compared</p><p>to using static fields.</p><p>Calculated fields, especially those involving string operations like concatenation, can be significantly</p><p>slower because they require runtime computation. This contrasts with static fields that are indexed</p><p>and retrieved directly from the database without additional computational overhead.</p><p>References:</p><p>Kinaxis RapidResponse documentation on hierarchy design and performance considerations.</p><p>Kinaxis best practices for creating efficient hierarchies and using calculated fields.</p><p>Using a calculated field, especially one that concatenates strings like in option C, can significantly</p><p>impact performance because it requires additional computation for each record. This is more resource-</p><p>intensive than using a direct field value, which would explain the poorer performance when using the</p><p>PartFamily hierarchy compared to the PartPlanner hierarchy.</p><p>References:</p><p>Kinaxis RapidResponse Author Level 3 training materials1.</p><p>Web search results and Kinaxis best practices2.</p><p>3.You are creating a new script that must insert a new customer record, archive that record weekly in</p><p>a new scenario, and then commit the child scenario to a parent scenario. You already have a script</p><p>that commits child scenarios.</p><p>2 / 8</p><p>https://www.dumpsinfo.com/</p><p>Referring to the graphic, which code will call the script that commits child scenarios in your new</p><p>script?</p><p>A. I</p><p>B. II</p><p>C. III</p><p>D. IV</p><p>Answer: D</p><p>Explanation:</p><p>The code block IV is correctly using the script execution pattern in RapidResponse. It first gets the</p><p>script using rapidResponse.scripts.get()method with the correct parameters for the name and scope,</p><p>and then calls the script with.call()method, passing the necessary scenario argument. This is how you</p><p>would invoke another script from within a script.</p><p>ReferencesThe use ofrapidResponse.scripts.get()andcall()methods is standard practice in Kinaxis</p><p>RapidResponse for executing one script from within another, as detailed in the Kinaxis</p><p>RapidResponse scripting documentation.</p><p>4. Display relevant work order data in worksheets based on the ScheduledReceipt table and the</p><p>referenced WorkOrderInfo table.</p><p>Answer: D</p><p>Explanation:</p><p>Create a reference field on the ScheduledReceipt table to the WorkOrderInfo table.</p><p>Display relevant work order data in worksheets based on the ScheduledReceipt table and the</p><p>referenced WorkOrderInfo table.</p><p>Very Detailed Explanation, The best practice in this scenario, according to Kinaxis, is to create a</p><p>reference from the ScheduledReceipt table to the WorkOrderInfo table. This allows for direct linking of</p><p>records between these tables. The worksheets based on the ScheduledReceipt data can then</p><p>leverage this reference to display related information from the WorkOrderInfo table, ensuring that the</p><p>data is accurately aligned and easily accessible for reporting and analysis.</p><p>ReferencesThis recommendation aligns with Kinaxis’s guidance for structuring worksheets and data</p><p>models to efficiently report and analyze data from multiple related tables without the need for</p><p>redundant worksheets or complex lookup structures.</p><p>5.The Bill of Material structure is shown in the graphic. The quantity per for each component is shown</p><p>3 / 8</p><p>https://www.dumpsinfo.com/</p><p>in parentheses. Independent demand for 100 units of item AAA has been received.</p><p>There are no ScheduledReceipt or OnHand records for any of the items;</p><p>PartSource.OrderPolicy.OrderGenerationRule = Anytime.</p><p>What is the correct PegPart, DriverPart, and NeedQuantity found in the WhereConsumed table for</p><p>item DDD?</p><p>A. PegPart is assigned BBB DriverPart is assigned AAA NeedQuantity = 1600</p><p>B. PegPart is assigned AAA DriverPart is assigned BBB NeedQuantity = 1600</p><p>C. PegPart is assigned DDD DriverPart is assigned BBB NeedQuantity = 400</p><p>D. PegPart is assigned BBB DriverPart is assigned AAA NeedQuantity = 400</p><p>Answer: B</p><p>Explanation:</p><p>In the WhereConsumed table, the PegPart represents the item driving the need for the component. In</p><p>this case, the independent demand for AAA requires components BBB and DDD to be produced. The</p><p>DriverPart is the direct parent in the Bill of Material (BOM) for DDD, which is BBB. The NeedQuantity</p><p>is calculated by multiplying the demand for AAA by the quantity per of BBB (100 units * 4) and then by</p><p>the quantity per of DDD (400 units * 4), resulting in a NeedQuantity of 1600 for DDD.</p><p>ReferencesThis answer follows the logic of BOM explosion and the principles of MRP (Material</p><p>Requirements Planning) that can be found in the Kinaxis RapidResponse documentation, which</p><p>outlines how to</p><p>calculate the required quantities of each item in the BOM based on the independent</p><p>demand.</p><p>6.You have a worksheet showing work orders. You are asked to report the date used to convert the</p><p>calculated field EffectiveUnitPrice.</p><p>Which expression will accomplish this task?</p><p>A. DATEVALUE(EffectiveUnitPrice)</p><p>4 / 8</p><p>https://www.dumpsinfo.com/</p><p>B. CONVERTONDATE(EffectiveUnitPrice, $ConversionDate)</p><p>C. DATETIMEVALUE(EffectiveUnitPrice)</p><p>D. ASSOCIATEDDATE(EffectiveUnitPrice)</p><p>Answer: B</p><p>Explanation:</p><p>To report the date used to convert the calculated field EffectiveUnitPrice, the CONVERTONDATE</p><p>function is the appropriate one to use. This function converts a measure's value from one date to the</p><p>value it would have on another date. The $ConversionDate variable (or similar) would typically be</p><p>used within the worksheet to reference the date to which the conversion is applied.</p><p>ReferencesThe Kinaxis RapidResponse documentation on calculated fields and conversion functions</p><p>explains how the CONVERTONDATE function is used to adjust financial measures based on</p><p>changes over time, which would apply to fields such as EffectiveUnitPrice.</p><p>7.Referring to the graphic, the TV Family represents an MPSConfig planning BOM. No supply is</p><p>available.</p><p>What will be the quantity of the planned order created for the TV family?</p><p>A. 200</p><p>B. 600</p><p>C. 800</p><p>D. 1000</p><p>Answer: D</p><p>Explanation:</p><p>5 / 8</p><p>https://www.dumpsinfo.com/</p><p>The SalesForecast for the TV family is for 1000 units, as shown in the graphic. The MPSConfig</p><p>planning BOM will generate a planned order equal to the SalesForecast quantity because there is no</p><p>available supply. OptionRatio and QuantityPer indicatethe proportion of the forecast to be planned for</p><p>each product type (LCD and Plasma), not the total quantity to be planned. Therefore, the planned</p><p>order quantity will match the total forecasted demand, which is 1000 units.</p><p>ReferencesThis conclusion is drawn from the Master Production Schedule (MPS) and Bill of Materials</p><p>(BOM) configuration rules within Kinaxis RapidResponse. When there is no supply to meet demand</p><p>and forecasts are being translated into planned production, the full amount of the forecast typically</p><p>becomes the planned order quantity.</p><p>8.Given this information and referring to the graphic:</p><p>Number of Days of Supply: 2</p><p>DaysSupplyRule: ByPeriod</p><p>PeriodSupplyInterval: Week</p><p>PeriodSupplyDueCalendar: Week</p><p>Which statement about the planned order(s) that are created is true?</p><p>A. Two planned orders will be created; one due on day 1 (first Monday) for a quantity of 80 and</p><p>another on day 6 (second Monday) for a quantity of 75.</p><p>6 / 8</p><p>https://www.dumpsinfo.com/</p><p>B. Two planned orders will be created; one due on day 2 (first Tuesday) for a quantity of 80 and</p><p>another on day 6 (second Monday) for a quantity of 75.</p><p>C. A single planned order will be created due on day 2 (first Tuesday) for a quantity of 155.</p><p>D. A single planned order will be created due on day 1 (first Monday) for a quantity of 155.</p><p>Answer: A</p><p>Explanation:</p><p>The DaysSupplyRule set to ByPeriod with a PeriodSupplyInterval of a Week means that the planned</p><p>orders will be generated to cover demands within each supply interval (week) separately.</p><p>For the first week, the total</p><p>demand is 25+15+30=70, but the order quantity is rounded up to the nearest multiple of the Days of</p><p>Supply number, which is 2. Therefore, the order quantity is 80. For the second week, the demand is</p><p>40+20+15=75, which matches the Days of Supply number, hence no rounding is needed, and the</p><p>order quantity is 75.</p><p>ReferencesThis answer is based on the Kinaxis RapidResponse concepts for demand and supply</p><p>planning where Days of Supply calculations determine the size and timing of planned orders,</p><p>considering the rules set for supply intervals and calendars.</p><p>9.At a customer site, there are multiple TimePhasedSafety records that are duplicated in the Baseline</p><p>scenario.</p><p>This is caused by the cross-scenario update from a child scenario.</p><p>What are two Kinaxis best practices for cross-scenario updates to prevent this situation? (Choose</p><p>two.)</p><p>A. Include all key fields and all reference fields in the update to help the database clearly identify</p><p>matching records.</p><p>B. Identify fields that should be used to match records by making them read-only.</p><p>C. List the identifying fields ahead of the other columns.</p><p>D. Delete all records in Baseline before the update to allow the database to re-link records that have a</p><p>corrupted version chain.</p><p>Answer: A C</p><p>Explanation:</p><p>To prevent duplication of TimePhasedSafety records in cross-scenario updates:</p><p>Statement A: Including all key and reference fields in the update is a best practice. This ensures that</p><p>the database can accurately match records across scenarios, reducing the risk of duplications.</p><p>Statement C: Listing identifying fields ahead of other columns in the update process helps in</p><p>prioritizing these fields during the matching process, enhancing the accuracy of record linkage and</p><p>minimizing duplication errors.</p><p>References</p><p>Kinaxis RapidResponse documentation and best practices on Automation Chains and Scheduled</p><p>Tasks.</p><p>References:The search did not yield specific documentation on best practices for cross-scenario</p><p>updates in Kinaxis RapidResponse. However, these answers are aligned with general best practices</p><p>for database</p><p>management and updates to prevent duplication and ensure data integrity.</p><p>10. Create a column in the ScheduledReceipts worksheet to lookup values in the WorkOrderInfo</p><p>worksheet.</p><p>B. 1. Create a composite worksheet using two component worksheets, ScheduledReceipt and</p><p>WorkOrderInfo.</p><p>7 / 8</p><p>https://www.dumpsinfo.com/</p><p>Powered by TCPDF (www.tcpdf.org)</p><p>8 / 8</p><p>https://www.dumpsinfo.com/</p><p>http://www.tcpdf.org</p>